The pipeline simply rests on its supports; it is not actually welded or otherwise affixed in place. This is necessary because the air temperature swings by over 150 °F (83 °C) from winter to summer, causing extreme heat expansion: the length of the pipeline changes by over 5 miles over the course of a year.[133] The pipeline was constructed 11 miles "too long" to account for this.[134]